Data Loading

The legacy system data loads that should be budgeted for when estimating the cost of a PLM or ECM implementation include:

  • Drawings and engineering bills of material
  • Policy and procedure documents, quality manual
  • Work instructions
  • Work authorizations
  • Design basis documents/databases
  • Contracts
  • Proposals
  • Laboratory test results
  • Certification packages
  • Software
  • Plant maintenance

Data Loading Issues:

A few of the challenges associated with a data load from a legacy system include:

Create names for objects:

  • Name and revision must be unique.
  • Names must have a useful structure.
  • Names must address both parts lists and drawings.
  • Names for files must include page numbers.

Generate load files for objects:

  • Revisions must be sorted so they can be loaded in order.
  • Security codes must be included so appropriate policies can be loaded for objects.
  • Objects must be loaded in the appropriate state.
Validate the results:
  • Some documents and pages may not load.
  • Check such issues as key existence, key uniqueness, coverage of the input source file by the resulting load files, and so on.

Integration Overview
Authoring Tools
View/Markup Tools
Rendition/Print
Full Text Search
Data Loading